KMA Electric provides a total solution for your new construction needs. Our electricians get the job done quickly and under budget. As a full service electrical contractor we own all of the equipment necessary to complete a project without the hassle of renting. We specialize in commercial projects and are proud to stand by any electrical system we install. Click here to learn more about KMA Electric. KMA Electric provides a total solution for your new construction needs. Our electricians get the job done quickly and under budget. As a full service electrical contractor we own all of the equipment necessary to complete a project without the hassle of renting. We specialize in commercial projects and are proud to stand by any electrical system we install. Click here to learn more about KMA Electric.
|
|
| |
| |
| |
| |
| |
We use the latest in no trench plowing. We can perform long-distance trenchless installation of pipe, conduit and cable for electrical service.
Benefits of Tunnel Plowing vs Ditch Trenching
• Damage and restoration of the work site can be limited, with very little clean up required
• Navigate under obstacles like parking lots or other hard to reach locations
• Installation of new service into an area with existing lines and buried cable from other services that would otherwise complicate the project
• Tunnels 15,000 feet per day
• Tunnels 2 inch conduit at 3 feet depth
We use the latest in no trench plowing. We can perform long-distance trenchless installation of pipe, conduit and cable for electrical service.
Benefits of Tunnel Plowing vs Ditch Trenching
• Damage and restoration of the work site can be limited, with very little clean up required
• Navigate under obstacles like parking lots or other hard to reach locations
• Installation of new service into an area with existing lines and buried cable from other services that would otherwise complicate the project
• Tunnels 15,000 feet per day
• Tunnels 2 inch conduit at 3 feet depth
|
|
| |
Our service fleet has the equipment necessary for heavy-duty trenching, vibratory plowing and pavement cutting. We can dig to 99 inches (2.5 m) and plow to 48-inch (1.2 m) depths for installation of mainline utilities, underground conduit or wiring.
Our service fleet has the equipment necessary for heavy-duty trenching, vibratory plowing and pavement cutting. We can dig to 99 inches (2.5 m) and plow to 48-inch (1.2 m) depths for installation of mainline utilities, underground conduit or wiring.
|
| |
| |
We can expand your existing service without requiring extensive reconstruction.
• 40,000 lbs of pulling power
• 2500 feet of cable at once
We can expand your existing service without requiring extensive reconstruction.
• 40,000 lbs of pulling power
• 2500 feet of cable at once
|
| |
| |
We can locate and dig up for repair your existing underground electrical wiring for cost effective repair work instead of a complete replacement. This service will save you time and money.
• Locate Existing Lines
• Repair Underground Wiring
• Quick and easy to find electrical breaks
• General locating before construction starts
We can locate and dig up for repair your existing underground electrical wiring for cost effective repair work instead of a complete replacement. This service will save you time and money.
• Locate Existing Lines
• Repair Underground Wiring
• Quick and easy to find electrical breaks
• General locating before construction starts
|
| |
| |
KMA Electric provides auguring services for all your construction needs.
• 3 feet diameter hole
• Up to 18 feet deep
• Fast, Efficient Service
KMA Electric provides auguring services for all your construction needs.
• 3 feet diameter hole
• Up to 18 feet deep
• Fast, Efficient Service
|
|
| |
Set up and installation of utility poles with the latest equipment.
• Utility poles
• Lighting Poles
• Ask for additional services
• 113 foot reach
• 15 ton lifting capacity
Set up and installation of utility poles with the latest equipment.
• Utility poles
• Lighting Poles
• Ask for additional services
• 113 foot reach
• 15 ton lifting capacity
|
|
| |